Skip to content
The Wildcat Valley Railway
  • My Love of Model Railroading
  • The Layout
    • A Tour of the Layout
    • The WVR at night
  • Design
    • The Wildcat Valley RR Design Rules
    • Final Track Plan for the WVR
  • Construction
    • Benchwork is the Backbone of the Model Railroad
    • Construction of the Sawmill and Log Pond
    • Rebuilding the Tired Engine Facility
      • Scratch Built Railroad Turntable
      • A New Coaling Tower From out of the Past
    • The Hidden Staging Area
  • Systems
    • The DCC buss is the heart of the layout
    • Block Occupancy Detection on the Wildcat Valley
    • Turnout Control on the WVR
    • Layout Lighting
    • Structure Lighting
    • Using JMRI to Control Trains on the WVR
  • My AP Journey
  • Links
  • WVR Blog
    • Blog Archives
The Wildcat Valley Railway
  • My Love of Model Railroading
  • The Layout
    • A Tour of the Layout
    • The WVR at night
  • Design
    • The Wildcat Valley RR Design Rules
    • Final Track Plan for the WVR
  • Construction
    • Benchwork is the Backbone of the Model Railroad
    • Construction of the Sawmill and Log Pond
    • Rebuilding the Tired Engine Facility
      • Scratch Built Railroad Turntable
      • A New Coaling Tower From out of the Past
    • The Hidden Staging Area
  • Systems
    • The DCC buss is the heart of the layout
    • Block Occupancy Detection on the Wildcat Valley
    • Turnout Control on the WVR
    • Layout Lighting
    • Structure Lighting
    • Using JMRI to Control Trains on the WVR
  • My AP Journey
  • Links
  • WVR Blog
    • Blog Archives

Tag: LED

April 6, 2020Uncategorized

Various Projects

Well, I’m still working my regular job for the time being, so I have not had as much time to work on […]

March 10, 2020Uncategorized

OK, I’m a little excited…

One aspect of the layout that I have been working on is lighting and with the help of an article on MRH […]

March 9, 2020Uncategorized

Spring time?

It was a beautiful day today in Indiana, Tucker and I took a break from working inside to set on the deck […]

March 18, 2019Uncategorized

A Mountain of Work 2

After much cutting of wood, leveling, screwing, and a few choice words, the sub-roadbed for the mountain helix is nearly finished. I […]

© 2025 The Wildcat Valley Railway. Proudly powered by Sydney
Verified by MonsterInsights