Skip to content
The Wildcat Valley Railway
  • My Love of Model Railroading
  • The Layout
    • A Tour of the Layout
    • The WVR at night
  • Design
    • The Wildcat Valley RR Design Rules
    • Final Track Plan for the WVR
  • Construction
    • Benchwork is the Backbone of the Model Railroad
    • Construction of the Sawmill and Log Pond
    • Rebuilding the Tired Engine Facility
      • Scratch Built Railroad Turntable
      • A New Coaling Tower From out of the Past
    • The Hidden Staging Area
  • Systems
    • The DCC buss is the heart of the layout
    • Block Occupancy Detection on the Wildcat Valley
    • Turnout Control on the WVR
    • Layout Lighting
    • Structure Lighting
    • Using JMRI to Control Trains on the WVR
  • My AP Journey
  • Links
  • WVR Blog
    • Blog Archives
The Wildcat Valley Railway
  • My Love of Model Railroading
  • The Layout
    • A Tour of the Layout
    • The WVR at night
  • Design
    • The Wildcat Valley RR Design Rules
    • Final Track Plan for the WVR
  • Construction
    • Benchwork is the Backbone of the Model Railroad
    • Construction of the Sawmill and Log Pond
    • Rebuilding the Tired Engine Facility
      • Scratch Built Railroad Turntable
      • A New Coaling Tower From out of the Past
    • The Hidden Staging Area
  • Systems
    • The DCC buss is the heart of the layout
    • Block Occupancy Detection on the Wildcat Valley
    • Turnout Control on the WVR
    • Layout Lighting
    • Structure Lighting
    • Using JMRI to Control Trains on the WVR
  • My AP Journey
  • Links
  • WVR Blog
    • Blog Archives

Month: July 2019

July 22, 2019Uncategorized

Signal Working

Here is a You Tube video showing a test of a Tomar semaphore on my layout. The semaphore is animated by a […]

July 16, 2019Uncategorized

Turnout Control – Update

The turnout control I described in my last post was working great… That is until I subsequently added block detection to the […]

© 2025 The Wildcat Valley Railway. Proudly powered by Sydney
Verified by MonsterInsights