Skip to content
The Wildcat Valley Railway
  • My Love of Model Railroading
  • The Layout
    • A Tour of the Layout
    • The WVR at night
  • Design
    • The Wildcat Valley RR Design Rules
    • Final Track Plan for the WVR
  • Construction
    • Benchwork is the Backbone of the Model Railroad
    • Construction of the Sawmill and Log Pond
    • Rebuilding the Tired Engine Facility
      • Scratch Built Railroad Turntable
      • A New Coaling Tower From out of the Past
    • The Hidden Staging Area
  • Systems
    • The DCC buss is the heart of the layout
    • Block Occupancy Detection on the Wildcat Valley
    • Turnout Control on the WVR
    • Layout Lighting
    • Structure Lighting
    • Using JMRI to Control Trains on the WVR
  • My AP Journey
  • Links
  • WVR Blog
    • Blog Archives
The Wildcat Valley Railway
  • My Love of Model Railroading
  • The Layout
    • A Tour of the Layout
    • The WVR at night
  • Design
    • The Wildcat Valley RR Design Rules
    • Final Track Plan for the WVR
  • Construction
    • Benchwork is the Backbone of the Model Railroad
    • Construction of the Sawmill and Log Pond
    • Rebuilding the Tired Engine Facility
      • Scratch Built Railroad Turntable
      • A New Coaling Tower From out of the Past
    • The Hidden Staging Area
  • Systems
    • The DCC buss is the heart of the layout
    • Block Occupancy Detection on the Wildcat Valley
    • Turnout Control on the WVR
    • Layout Lighting
    • Structure Lighting
    • Using JMRI to Control Trains on the WVR
  • My AP Journey
  • Links
  • WVR Blog
    • Blog Archives

Month: January 2019

January 30, 2019Uncategorized

Getting Close!

I’ve been working on the new train room for some time now. The lights are in and the carpet is laid. I […]

January 18, 2019Uncategorized

Ramblings

Well, I’m still trying to get the train room in shape so I can get back to workin’ on the railroad, someday. […]

January 2, 2019Uncategorized

Thoughts of the New Year?

Here we are, sailing off into a new year, but I would be remiss if I failed to consider the events of […]

© 2025 The Wildcat Valley Railway. Proudly powered by Sydney
Verified by MonsterInsights